Project Description
Project Title
Plough lane-Wimbledon
About This Project
Jatheesan ltd was commissioned by Mode best(Main Contractors Galliyard) to carry out Engineering works at Plough lane wimbledon..
Exciting new development coming soon to wimbledon. Set to form part of amixed-use scheme,including new purpose built stadium for AFC Wibledon, This residential segment feature 114 properties,offering mixture of one ,two and three bedroom luxury apartments
Job Specification
- Check existing Control Network.
- Establish & Maintain Primary and Secondary Control Network
- Setting out All Structural columns and wall positions .
- Set Out Grid-Line on each floor of existing concrete structure.
- Establish Level Datum's on each floor of existing Concrete Structure.
- Conduct A full As-Built Survey of existing concrete structure.
- Calculate amount of concrete need at site to finish work.
- Taking photos and recording information for quality control.