Home   >   Project   >   Site Engineering   >   Plough lane Wimbledon
 

Project Description

Project Title

Plough lane-Wimbledon


About This Project

Jatheesan ltd was commissioned by Mode best(Main Contractors Galliyard) to carry out Engineering works at Plough lane  wimbledon..

Exciting new development  coming soon to wimbledon. Set to form part of amixed-use scheme,including new purpose built stadium for AFC Wibledon, This residential segment feature  114 properties,offering mixture of one ,two and three bedroom luxury apartments

Job Specification

  • Check existing  Control  Network.
  • Establish & Maintain Primary and Secondary Control  Network  
  • Setting out All Structural columns and  wall positions .
  • Set Out  Grid-Line on each floor of existing concrete structure.
  • Establish Level Datum's on each floor of existing Concrete Structure.
  • Conduct A full As-Built Survey of existing concrete structure.
  • Calculate amount of concrete need at site to finish  work.
  • Taking photos and recording information for quality control.

related Projects